
UPS Capacity:150KVABack-up time: 3 hours
Background:
The lead-acid battery of UPS has caused problems in the operation of subway station, such as too much space occupied , excessive ground bearing capacity, no monitoring of battery operationa and frequent maintenance.
Solution:
UPS lithium battery system for the subway sration to achieve four major convenience: space saving, load bearing, battery system monitoring and maintenance relief.
Project configuration :
- 240V408Ah Battery Storage System *5 pcs
- UPS of a Korean Brand provided by the costomer