The power supply capacity of the station is not enough, only 190kva in total, which can not support the high-power fast charging demand of new energy vehicles, and the charging speed is slow.
Learn moreThe Netherlands has issued a policy banning fuel vehicles in major cities by 2030, with huge new-energy car charging stations and electricity distribution needs that the local grid can not meet.
Learn moreIn order to support the urban development of Boao Le City International Medical Tourism Advance Zone, meet the demand of power load growth in the leading area, and fully support the promotion of green low-carbon and eco-beautiful construction in Hainan…
Learn moreThe load of data center needs stable and uninterrupted operation, and UPS is needed as the guarantee of uninterrupted power supply.
Learn moreThe lead-acid battery of UPS has caused problems in the operation of subway station, such as too much space occupied , excessive ground bearing capacity, no monitoring of battery operationa and frequent maintenance.
Learn moreLhasa Xingye Bank Project is located on the roof of Lhasa Xingye Bank. The project uses the bank building roof to build a total installed capacity of 217.8 kWp PV power generation system. The power generation system adopts 0.4 KV spontaneous self-use surplus power network mode, and the network is the low voltage side of the user distribution room.
Learn moreProject background: In order to ensure the uninterruption of electricity, the Russian Date Center need to invest in UPS project in a very limited place. Diesel generators produces noise and exhaust gas pollution during operation, while lead acid battery occupies a large area, so the space is not allowed, and the cycle life is short, so it can not realize the function of peak shaving.
Learn moreContact Ecube Sales Team
Contact Ecube International Sales Center
Email: dlf@ecube.net.cn
Tel: 86-311-86786213
Ecube's website uses cookies. By staying here you are agreeing to our use of cookies.
Learn more I AGREE