Reference

POSCO UPS Lithium-ion Battery System Project

POSCO, founded in 1968, is one of the largest steel manufacturers in the world and one of the top ten consortia in Korea.

Learn more
New Energy ChargingStation

The power supply capacity of the station is not enough, only 190kva in total, which can not support the high-power fast charging demand of new energy vehicles, and the charging speed is slow.

Learn more
Integrated New Energy ChargingStation

The Netherlands has issued a policy banning fuel vehicles in major cities by 2030, with huge new-energy car charging stations and electricity distribution needs that the local grid can not meet.

Learn more
Hainan New Energy ChargingStation

In order to support the urban development of Boao Le City International Medical Tourism Advance Zone, meet the demand of power load growth in the leading area, and fully support the promotion of green low-carbon and eco-beautiful construction in Hainan…

Learn more
Mobile Energy Storage Charging Vehicle

The notice of the State Council declared that by the end of 2020, more than 50% of the specialized berths (except dangerous goods berths) in the main coastal ports will be able to supply shore power to ships. The new wharf is planned, designed and constructed simultaneously.

Learn more
Subway Energy Feedback System(LTO)

In the case of no on-board energy feedback system in south Korean subway, braking and starting cause a large amount of power waste.

Learn more
Energy Storage UPS

The load of data center needs stable and uninterrupted operation, and UPS is needed as the guarantee of uninterrupted power supply.

Learn more
Subway Station UPS Lithium Battery(LFP)

The lead-acid battery of UPS has caused problems in the operation of subway station, such as too much space occupied , excessive ground bearing capacity, no monitoring of battery operationa and frequent maintenance.

Learn more
PV and UPSproject

Lhasa Xingye Bank Project is located on the roof of Lhasa Xingye Bank. The project uses the bank building roof to build a total installed capacity of 217.8 kWp PV power generation system. The power generation system adopts 0.4 KV spontaneous self-use surplus power network mode, and the network is the low voltage side of the user distribution room.

Learn more
2.5MWh UPS & Energy Storage System in Data Center

Project background: In order to ensure the uninterruption of electricity, the Russian Date Center need to invest in UPS project in a very limited place. Diesel generators produces noise and exhaust gas pollution during operation, while lead acid battery occupies a large area, so the space is not allowed, and the cycle life is short, so it can not realize the function of peak shaving.

Learn more
Inquiry
×

Send An Enquiry

Contact Us

Contact Ecube Sales Team

Contact Ecube International Sales Center


Email: dlf@ecube.net.cn

Tel: 86-311-86786213